Host-to-platform interface engineering

Motion Platform Integration

Define what your host sends, what the platform returns, when each command is valid, how faults behave and how the interface will be accepted—before either team reaches commissioning.

Project scope: integration is normally delivered with a CSCmotion motion-platform project. Existing CSCmotion configurations and third-party or legacy systems require a documented engineering review before compatibility, price or schedule can be confirmed.

First engineering response

What you get from the first review

Start with the correct commercial route

Which Integration Situation Matches Your Project?

The same request—“connect our software to the platform”—has three very different engineering and commercial meanings. Identifying the route early prevents a configuration discussion from becoming an undefined retrofit promise.

Normal route

New CSCmotion platform project

The controller, platform geometry, drive configuration, host boundary and acceptance plan are developed as one platform subsystem.

Prepare a new-platform brief →
Baseline review

Existing CSCmotion system

A new host, message set or command level is reviewed against the controller, firmware, parameters and documentation delivered with the system.

Review an existing configuration →
Conditional route

Third-party or legacy platform

A controller-only replacement cannot be confirmed until the retained mechanics, drives, feedback, wiring, geometry and safety circuits are reviewed.

Request a legacy feasibility review →
Feasibility before specification

A Project-Specific Interface, Not a Protocol Checklist

CSCmotion controller and software materials cover several network, fieldbus, serial and SDK routes. The route available to your project depends on the named controller, platform configuration and contracted software scope.

Still sizing? Payload, stroke and acceleration constrain one another, and picking a number for each independently is how projects end up unbuildable. Our guide to payload, stroke and acceleration explains the trade-off before you write a specification.
Platform side Controller, drive coordination, feedback, platform kinematics and platform-side limits remain within the approved platform configuration.
Possible routes Project configurations may use TCP/UDP, EtherCAT, CANopen or serial/Modbus routes. The quotation names the approved connection and hardware.
SDK / API Message definitions, SDK format and available language wrappers are confirmed for the selected controller and software scope—not assumed from another project.
Command level Normally platform pose, trajectory/profile or application-derived motion input. Direct actuator commands are exceptional and require a separate protection review.
Status returned Operating state, accepted/rejected command status, limits, faults and configured feedback values are defined in the command and status dictionary.
Timing Update period, jitter tolerance, timestamp convention, heartbeat and missed-frame response are fixed for the approved project route.
Acceptance Representative commands, state transitions, limits, timeouts, fault cases and recovery are converted into testable interface acceptance cases.
Evidence before integration commitment

What Makes the Interface Scope Verifiable?

A protocol name is not evidence of compatibility. The review becomes actionable when the controller baseline, interface package, data meaning and acceptance record can all be tied to the same approved project configuration.

Configuration baseline

Named controller and software revision

The quotation identifies the applicable controller, firmware, platform parameters and interface-document revision instead of borrowing assumptions from another project.

Interface package

Approved transport and SDK scope

The project confirms the physical connection, transport, message definition and any available SDK format or language wrapper for the selected configuration.

Data contract

Command and status dictionary

Fields, units, coordinates, rotation convention, valid ranges, states, faults, timeouts and rejected-command behaviour are controlled in one interface baseline.

Acceptance record

Repeatable interface test cases

Representative commands, state transitions, timeouts, fault recovery and version checks are converted into recorded FAT or agreed integration evidence.

Choose the abstraction before the packet format

What Should Your Host Command?

The strongest interface keeps application logic on the side that understands the application and platform-protection logic on the side that understands the platform. The correct boundary depends on what your host already computes.

01 / PLATFORM POSE

Send the motion the platform should reproduce

Your host sends the agreed translational and rotational pose or trajectory. Platform kinematics, coordinated actuator control and platform-side limits remain inside the controller.

02 / APPLICATION INPUT

Send vehicle, vessel or flight-derived motion

Use this route when motion cueing or another application-specific transformation is included in the agreed platform-side software scope. Ownership and tuning responsibility must be explicit.

03 / PROFILE & STATE

Coordinate profile playback, I/O and operating state

Use an agreed command set for profiles, start/hold/stop, sequence coordination and status when the application does not need a continuous pose stream.

Direct per-actuator commands are not the default API boundary. They may bypass platform-level coordination and limits, so any research or custom-control request is reviewed as a separate engineering route.

Your host normally owns

The application meaning of the motion and the sequence around the wider simulator, test rig or machine.

The platform controller normally owns

The coordinated platform response within the approved controller and mechanical configuration.

Defined together: coordinate frames, units, rotation order, message meaning, update timing, state transitions, timeout behaviour, safety-status exchange, acceptance inputs and recorded evidence.
Make every assumption testable

Define the Motion Platform Interface Contract

The interface control document is the engineering baseline shared by the host and platform teams. It converts “we support the same protocol” into agreed data meaning, valid states, fault behaviour and acceptance evidence.

Contract item What must be defined Risk if left open Acceptance evidence
Data meaning Command and status fields, types, valid ranges, scaling and invalid-value handling. Valid packets with incompatible meaning. Approved command/status dictionary and boundary-value cases.
Units & coordinates Reference frame, origin, signs, units, rotation sequence and transform owner. Correct magnitudes in the wrong direction or frame. Positive/negative axis checks and representative combined poses.
Timing Update period, timestamps, jitter tolerance, heartbeat and reconnect sequence. Intermittent faults that appear only under real network conditions. Nominal, delayed, dropout and reconnect cases.
Missed frames How missed or stale data is detected and the approved hold, neutral or stop response. An undefined response when the command stream is interrupted. Injected data loss with recorded state and platform response.
States & commands Connected, ready, enabled, active, hold, stop, fault, reset and preconditions. A valid command sent in a state where it must not execute. State-transition matrix with accepted and rejected commands.
Limits & workspace Configured platform limits and representative multi-axis motion inside the combined envelope. Repeated limit events caused by treating single-axis maxima as simultaneous capability. Representative command sequence reviewed against the approved configuration.
Version baseline Controller, firmware, API/SDK, platform parameters and document revision. An accepted interface becomes an undefined moving target after a software change. Release record and controlled configuration baseline.
Valid commands depend on operating state

States, Faults and the Safety Boundary

A useful interface describes more than normal motion. The host must know the platform state, which commands are valid, how a timeout is handled and what is required before recovery.

 

The API is not the safety chain

Still sizing? Payload, stroke and acceleration constrain one another, and picking a number for each independently is how projects end up unbuildable. Our guide to payload, stroke and acceleration explains the trade-off before you write a specification.

Invalid command

Define whether it is rejected, clamped or causes a state change, and which diagnostic information returns to the host.

Heartbeat or data timeout

Define the timeout basis, the platform response, how the host is notified and the controlled restart sequence.

Limit reached

Define whether the command is limited, held or rejected and how the event is distinguished from a drive or safety fault.

Fault and reset

Define recoverable faults, acknowledgement ownership and the physical checks required before reset or re-enable.

Version mismatch

Define how incompatible software, interface and configuration revisions are detected and prevented from running together.

Separate early review from contracted deliverables

What the Review Produces—and What the Project Accepts

A preliminary review should help you make the next decision without pretending that an unnamed controller, timing guarantee or custom software deliverable has already been contracted.

Initial review

Feasibility direction

Based on the architecture and objectives you send, the first response identifies the likely route and open decisions.

Contracted baseline

Interface deliverables

The approved quotation and technical specification define the exact items delivered with the platform project.

Separate scope when needed

Custom engineering

Requirements outside the approved standard route are estimated after the technical boundary is understood.

Direct per-actuator commands are not the default API boundary. They may bypass platform-level coordination and limits, so any research or custom-control request is reviewed as a separate engineering route.

Interface FAT

Factory acceptance cases are selected for the contracted project configuration and agreed evidence format.

System SAT

Site acceptance adds variables outside the platform subsystem: the real host, site network, payload, guarding, facility services and wider-machine sequence.

Best practice: if your host can be available during factory acceptance, include representative messages and fault cases before shipment. If it cannot, agree a test host, recorded inputs and the exact evidence that will transfer into site integration.
Conditional engineering route

Legacy Controller Upgrades Require Engineering Review

Replacing only the controller changes the behaviour of retained drives, feedback, limits, brakes, wiring, mechanics and safety circuits. A credible review starts with the retained subsystem, not just the controller model.

The review may support a bounded configuration change, identify a wider cabinet or subsystem replacement, or conclude that the available records and retained equipment do not support a responsible upgrade.

No universal retrofit promise. Compatibility, price, schedule and final performance are not confirmed until the retained equipment, geometry, records and intended change have been reviewed.

Platform identity

Manufacturer, model, serial/project reference, year and current use

Mechanical baseline

DOF, actuator arrangement, stroke, load, CG, inertia and drawings

Drives & feedback

Motors, drives, encoders, sensors, brakes, limits and communication

Electrical & safety

Schematics, cabinet, power, I/O, E-stop and interlock information
 

Current software

Controller, host, interface, parameters, licences and source availability

Change objective

Obsolescence, fault, new host, new motion, performance or support requirement
 
Continue from the question your team owns

Where to Go Next

A delivery route is one of four decisions. Which platform architecture, what physical job it has to do, how the engineering works and what it costs are answered in their own sections — so nothing here repeats what belongs there.

Which platform

Motion Platforms

Compare 3DOF, 6DOF and Stewart architectures, electric drive, high-payload and compact configurations, and the motion control system that runs them.

Choose a Motion Platform →
Which job

Applications

Industrial testing, research, driving and flight simulation, motion compensation and maritime motion — each brings its own load, duty cycle and validation method.

Define the Application →
How it works

Technology

Stewart geometry, hexapod kinematics, motion cueing, safety architecture, and how payload, stroke and acceleration constrain each other.

Understand the Engineering →
What it costs and who to buy from

Resources

Buying guides on choosing a platform, budgeting a project, comparing manufacturers and deciding whether to build or buy.

Open the Buying Guides →
Proof

Case Studies

Delivered projects with the requirement, the engineering decisions, the interfaces we owned and the measured validation behind them.

Review the Evidence →
Who you are buying from

Company

A 20,000 m² production base in Nanjing with in-house servo cylinder and controller manufacturing, ISO 9001 / 14001 / 45001 and documented acceptance testing.

See the Factory →
Commercial and engineering questions

Controller & API Integration FAQ

These answers describe the normal review process. The approved quotation, technical specification and interface control document determine the exact project configuration and responsibility.

Possible project routes include network, fieldbus and serial interfaces. CSCmotion controller and software materials cover routes such as TCP/UDP, EtherCAT, CANopen and serial/Modbus for different configurations. The exact transport, message format, SDK language and software deliverables are confirmed for the named project configuration.

It depends on the controller route, command level, host architecture, network conditions and required fault response. Update period, jitter tolerance, timestamps and missed-frame behaviour are defined together in the project baseline rather than inferred from a protocol name.

The normal boundary keeps platform kinematics, actuator coordination and platform-side limits inside the controller. Motion cueing can sit in your host or in an approved platform-side software scope. The interface control document names the owner and the accepted command level.

No. The API can report status and request an orderly stop, but it does not replace emergency-stop circuits, guarding, interlocks, travel limits, safe-energy behaviour or the complete-machine risk assessment.

A contracted platform project may include the interface control document, command and status definitions, coordinate and state rules, a configuration baseline and interface acceptance cases. Custom protocols, customer host development, third-party sensors and on-site work are scoped separately when required.

Only after engineering review. We need the retained mechanical, drive, feedback, electrical, safety, geometry and software baseline. The outcome may be a bounded controller change, a wider cabinet or subsystem replacement, or a recommendation not to retain the existing equipment. See motion platform retrofit support.

Interface feasibility review

Send Your Host Architecture and Success Criteria

Tell us what generates the motion, what you intend to send and what must work at the end. Our first response will identify the likely command boundary, the information still missing and the next engineering step.

Complete moving load, centre of gravity and available CAD

Required axes and one representative motion profile

Installation, mounting, power and environment

Host interface and safety responsibilities

Prototype, first article or expected repeat quantity

FAT, documentation, country and target schedule